Topsoil Calculator: Cubic Yards and Tons
Enter the area and depth you want to fill. The calculator returns cubic yards (how bulk loads are sold), cubic feet and an approximate weight.
Your result
- Volume needed
- 2.47 cubic yards
- Approx. weight (topsoil)
- 2.72 tonsloose, indicative
- Cubic feet
- 66.67 cu ft
Inputs: Area to cover 200 sq ft; Depth 4 in; Material 8; Your price per cubic yard 0 USD. Estimate only.
How this is calculated
- Area x depth in inches / 324 = cubic yards: 200 x 4 / 324 = 2.469.
- Weight = cubic yards x density; Topsoil is indicatively 1.1 short tons per cubic yard (Designing Buildings Wiki).
Primary result: 2.47 cubic yards. Round up when you buy, and ask your supplier about delivery minimums.
The same area at different depths
| Depth | Volume needed (cubic yards) | Approx. weight (topsoil) (tons) | Cubic feet (cu ft) |
|---|---|---|---|
| 1 | 0.62 | 0.68 | 16.67 |
| 2 | 1.23 | 1.36 | 33.33 |
| 4 | 2.47 | 2.72 | 66.67 |
| 6 | 3.7 | 4.07 | 100 |
| 8 | 4.94 | 5.43 | 133.33 |
Good to know
- Weights are loose bulk densities and vary with moisture and source; the page they come from says they are not universal values. Ask your supplier for the weight of the load you are buying.
- Soil settles after spreading, so many people order a little extra for lawns and beds.
Frequently asked questions
How do I calculate cubic yards of soil?
Multiply the area in square feet by the depth in inches and divide by 324.
How much does a cubic yard weigh?
Indicatively 1.1 short tons for topsoil (Designing Buildings Wiki); it varies with moisture and source.
Sources
- Converting between weight and volume for bulk construction materials, Designing Buildings Wiki. Used for: indicative loose bulk densities in short tons per cubic yard (crushed stone, road base, pea gravel, sands, topsoil, garden soil mix, compost, bark mulch, recycled asphalt). The page warns they are not universal values. Checked 2026-11-24.
Unit definitions and geometry (area, volume, yards, feet, inches) are exact math and need no source. Any default marked as an assumption is yours to change.