Skip to content
JobCalc Pro

How many cubic yards in 2 tons of crushed stone, 3/4 in (19 mm)?

2 tons of crushed stone, 3/4 in (19 mm) is about 1.48 cubic yards at 1.35 tons per cubic yard.

Your result

Volume
1.48 cubic yards
Cubic feet
40 cu ft
Density used
1.35 tons per cubic yard

Save this result

How this is calculated

  1. Cubic yards = tons / density = 2 / 1.35 = 1.48.
  2. Densities are indicative loose values in short tons per cubic yard from the Designing Buildings Wiki table; the page says they are not universal.

Primary result: 1.48 cubic yards. Round up when you buy, and ask your supplier about delivery minimums.

Common load weights

WeightVolume (cubic yards)Cubic feet (cu ft)Density used (tons per cubic yard)
10.74201.35
21.48401.35
53.71001.35
107.412001.35
2014.814001.35

The answer for this project

2 tons of crushed stone, 3/4 in (19 mm) is about 1.48 cubic yards at 1.35 tons per cubic yard.

Pick the material and enter the tons on your ticket. You get cubic yards and cubic feet using an indicative loose density.

Good to know

  • Short tons (2,000 lb) are used here. Metric tonnes are about 10 percent heavier.
  • Moisture changes weight a lot, especially for sand and soil. Use your supplier's ticket for the final answer.

Frequently asked questions

How many cubic yards are in a ton of gravel?

About 0.74 for 3/4 inch crushed stone at 1.35 tons per cubic yard (1 divided by 1.35).

Sources

Unit definitions and geometry (area, volume, yards, feet, inches) are exact math and need no source. Any default marked as an assumption is yours to change.

More tons to cubic yards converter examples

Related calculators

More calculators

Landscaping: Beds and lawns

Landscaping: Stone, soil and sand

Landscaping: Hardscape

Landscaping: Converters

Building and finishing: Concrete

Building and finishing: Paving

Building and finishing: Finishing

Building and finishing: Roofing and exterior

Building and finishing: Framing

Building and finishing: Measuring