Skip to content
JobCalc Pro

How many pavers for 300 sq ft?

A 300 sq ft patio of 8 x 4 inch pavers takes about 1,485 pavers with 10 percent extra, 5.56 cubic yards of 6 inch gravel base and 0.93 cubic yards of bedding sand.

Your result

Pavers to buy
1,485 paversjoint widths ignored, rounded up
Gravel base
5.56 cubic yards
Gravel base weight
7.5 tonsat 1.35 tons per cubic yard, indicative
Bedding sand (1 in)
0.93 cubic yards

Save this result

How this is calculated

  1. Pavers = area x 144 / (length x width) x (1 + extra): 300 x 144 / (8 x 4) x 1.1.
  2. Base = area x base depth / 324 = 5.556 cubic yards. Bedding sand = area x 1 inch / 324 = 0.926 cubic yards.

Primary result: 1,485 pavers. Round up when you buy, and ask your supplier about delivery minimums.

The same patio at different base depths

Gravel base depthPavers to buy (pavers)Gravel base (cubic yards)Gravel base weight (tons)Bedding sand (1 in) (cubic yards)
61,4855.567.50.93
81,4857.41100.93
101,4859.2612.50.93
121,48511.11150.93

The answer for this project

A 300 sq ft patio of 8 x 4 inch pavers takes about 1,485 pavers with 10 percent extra, 5.56 cubic yards of 6 inch gravel base and 0.93 cubic yards of bedding sand.

Enter the patio area and the size of one paver. The calculator returns how many pavers to buy, plus the gravel base and bedding sand underneath.

Request paver patio installation quotes

Want a local hardscape pro to price your patio? Tell us about the project and we'll save your request.

Good to know

  • Unilock's patio guide lists base gravel of 6 to 8 inches over well-draining subsoil and 10 to 12 inches over poor-draining subsoil, laid in lifts, with a 1 inch bedding course. Your paver maker, local frost conditions and any engineer govern.
  • Order extra pavers from the same lot so colors match if you need repairs later.

Frequently asked questions

How deep should a paver base be?

Unilock's installation guide lists 6 to 8 inches of base gravel over well-draining subsoil and 10 to 12 inches over poor-draining subsoil, plus a 1 inch bedding course.

How much bedding sand do I need?

Unilock specifies a 1 inch bedding course; that is area / 324 cubic yards.

Sources

  • How to Build a Patio on Grade, Unilock. Used for: base gravel of 6 to 8 inches over well-draining subsoil and 10 to 12 inches over poor-draining subsoil, with a 1 inch bedding course. Checked 2026-11-24.
  • Converting between weight and volume for bulk construction materials, Designing Buildings Wiki. Used for: indicative loose bulk densities in short tons per cubic yard (crushed stone, road base, pea gravel, sands, topsoil, garden soil mix, compost, bark mulch, recycled asphalt). The page warns they are not universal values. Checked 2026-11-24.

Unit definitions and geometry (area, volume, yards, feet, inches) are exact math and need no source. Any default marked as an assumption is yours to change.

More paver calculator examples

Related calculators

More calculators

Landscaping: Beds and lawns

Landscaping: Stone, soil and sand

Landscaping: Hardscape

Landscaping: Converters

Building and finishing: Concrete

Building and finishing: Paving

Building and finishing: Finishing

Building and finishing: Roofing and exterior

Building and finishing: Framing

Building and finishing: Measuring